Emergencies until 10pm. Ring first.Call

Garden lighting: plan it before you landscape

Cables run more easily before new paving and planting. What to decide on the walk round.

By Joseph Lawrence · 18th Edition (BS 7671) · 4 min read
Weatherproof outside socket on a brick wall

Order of work

Armoured cable goes in a trench before the paving and planting, not after. If the landscaper has started, ring me before the slabs go down.

What to decide

  1. 1Paths and steps first: that is the lighting you use every night.
  2. 2Then borders, trees and seating.
  3. 3An outside socket by the back door saves running extension leads through the house.
  4. 4Where the switches live, and whether you want a timer or a sensor.

Outside electrics and rain

Every outside circuit gets its own RCD protection and weatherproof fittings rated for the job. If your outside lights trip the board when it rains, that is a fault, not the weather.

Two ways to start

On a job? WhatsApp me and I'll reply the same day.

Small job? Send a photo.

Extra sockets, lights, faults that keep tripping. Send a few photos on WhatsApp and I can often price it the same day.

WhatsApp a photo

Bigger job? Get a quote.

Consumer units, rewires, kitchens, extensions and garden lighting. I visit, look at the installation properly, and send a written quote.

Get a quote
Get a quote
Get a quote
  1. 1The job
  2. 2Reply

1 · What's the job, and where?

Job type
Property type
Timing
Photos (optional)

    2 · Where should I reply?

    Preferred reply

    I'm usually on a job, so I reply in breaks and after work.