When the electrician should arrive on a kitchen extension

Early. First fix happens before plastering, so socket and lighting positions need agreeing first.

By Joseph Lawrence · 18th Edition (BS 7671) · 5 min read
Kitchen extension with three brass pendants lit at dusk

Before the plasterer

Cables, back boxes and the cooker circuit go in at first fix, while the walls are open. Once the plaster is on, every change costs more and leaves a mark.

What to decide on the walk round

  1. 1Where the appliances go, including the ones you might add later.
  2. 2Sockets above the worktop, and how many. More than you think.
  3. 3Under-cabinet and pendant lighting, and where the switches sit.
  4. 4Whether the board has room for the new circuits, or needs changing.

Second fix

After the plaster and the units: faceplates, lights, the hob and oven connections, then testing of every new circuit and the paperwork.

Two ways to start

On a job? WhatsApp me and I'll reply the same day.

Small job? Send a photo.

Extra sockets, lights, faults that keep tripping. Send a few photos on WhatsApp and I can often price it the same day.

WhatsApp a photo

Bigger job? Get a quote.

Consumer units, rewires, kitchens, extensions and garden lighting. I visit, look at the installation properly, and send a written quote.

Get a quote
Get a quote
Get a quote
  1. 1The job
  2. 2Reply

1 · What's the job, and where?

Job type
Property type
Timing
Photos (optional)

    2 · Where should I reply?

    Preferred reply

    I'm usually on a job, so I reply in breaks and after work.